Main stages of repair works in the apartment.
How to start repair of the apartment?
The very first phase of the repair of old apartment or condos is the destruction and dismantling first of all of the dilapidated walls and partition walls, removing the wall and ceiling finishing. This stage is among the most "filthy" stages of the repair.
One more amongst the most important and "dusty" works is the window block replacement. It is necessary to do this first off because dirt and dust will be unallowable throughout following phases and it is forbidden at all to open windows during painting and wallpaper works (big drops of the temperature and moisture are unallowable). After mounting windows and windowsills it is essential to pack them immediately in polyethylene movie and to cover windowsills in addition by the fiber board (in order to prevent scratches).
The following stage is wiring. Circuitry can be installed in walls or along the flooring. Circuitry is made inside the pipelines to guarantee electrical security and increase reliability. The pipe safeguards circuitry from external damages and allows to change the wire entirely without breaking walls and floor simply by inserting the brand-new wire instead of the old one.
House Painting follows the wiring. The frequent mistake throughout the synchronised conducting of such works takes place when employees forget to set out among the cables and house painters have already plastered and ravelled the wall. As an outcome, extra works are required to seal goes after on the ended up wall. The locations of the feed switch and wall outlet place and their number need to be thought-out beforehand. The scheme of power circuitry is generally consisted of into the design project.
Later on the system must be ready to service in case of failures. In addition to the electrical wirings, the telephone cable and the television cable are laid out. The power cable television need to not be laid out near the telephone and antenna cable televisions to prevent sound pickup and interference. The most peculiar minute is setting out the television cable television. In order to make two (or three) television set in the home the second cable is often simply "strongly soldered" in parallel, so the cable resistance is reduced. As an outcome, the screen quality is weakened, many programs can't be gotten and etc. In order to avoid such situation it is needed to invite an expert with special equipment. He will determine the signal level of the each TV-feeder and install TV-amplifiers or TV-filters.
Painting is the most long-term process, that is why it is performed all at once in all properties, if it is possible. Delays are linked with the innovation. Each used layer of the plaster (or completing ending up) must dry entirely before the work will continue.
Works in sanitary arrangements and the cooking area start at the same time with house painting. It is much better to fulfill so-called "filthy" operate in the top place and at the same time. In accordance with the strategy of the hygienic service technician area welding, wall chasing and pipeline run are performed. Steam radiator admissions are prepared, taps and brackets are installed, however radiators are not installed.
Then works in hygienic plans are conducted according to the strategy. The bath is mounted, then walls are smoothed out and the tile is laid on walls. The following phase is putting together ceiling and laying tiles on the floor. And at last other sanitary gadgets, mixers and accessories are mounted.
After wiring, setup of rosette plates and terminal boxes the voltage is signed in all point. Ends of electrical wiring are insulated and laid out into rosette plates. Sockets and breakers are not set up during this stage in order to save their surface area look. The surface puttying of walls is carried out all at once. The technologically precise control of drying of the layer of the plaster (filling) is carried out by drymeter. It is a special instrument that measures wetness of the material.
The following phase is the procedure of fill. Fill can be made with various products-- from typical masonry cement-sand mixture to self-aligning floorings. The advantage of the basic mix is its cheapness, the disadvantage is that such mix is much harder lined up at the level and the final dry time of such fill is 40 days, only then the next stage of the work with flooring can be carried out, i.e. the duration is too long. Self-leveling self-aligning floorings are a lot more costly, but more technological. Aligning takes place almost "automatically" i.e. fluid option of mix is poured out, then it runs and you receive the horizontal surface. The final dry time is 15 days i.e. you have substantial time economy. The system "warm flooring" is set up into the fill. If the so-called "damp processes" are inapplicable the technology of the dry aligning (the fill technology) is utilized bases for floorings with adjustable flooring here battens are mounted.
After fill door boxes and door are installed. Setup of doors should take into the account density of future flooring covering. After installation the door can be taken off its hinges and got rid of till the end of repair or loaded into polyethylene film to secure from damages. All at once ceiling can be painted and the tile can be laid in that facilities where it was prepared. The tile needs to be laid on the absolutely dry overlay.
Finishing of the flooring mounting depends upon the prepared covering. Most of the times (if finish covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are repaired to the flooring by self-tapping screws. One plywood sheet is fixed by 30-50 self-tapping screws to offer the close repairing of plywood and long-term service of the floor without squeak and bulging. The plywood provides the additional heat- and acoustic insulation. After mounting of the plywood is ended up, wallpaper for painting can be pasted on walls.
In premises where surface covering of the flooring is laminated flooring or parquet stockpile, the regular wallpapers are pasted (not for painting) in the very first place. Then the floor covering is mounted.
If surface covering of the floor is the block parquet, the parquet is laid in the first place, then it is scraped and covered by one layer of lacquer. After this the common wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The pointed out consequence is connected only with such rushing procedure when the great amount of dust is created. In spite of the fact that great floor mills are geared up with the vacuum cleaner, the enough amount of dust is sped up on surrounding subjects consisting of walls. Dust is very acerbic and is badly cleaned off. That is why in order not to damage wallpapers, they are pasted after rushing and in order the parquet do not take in the surplus moisture it is covered by the one layer of lacquer before wallpaper pasting.
In conclusion it is needed to keep in mind that the sequence of works was listed in basic and can alter depending upon the definite situation-- the variety of rooms in facility, your resources, peculiarities of the building of the multilevel facilities. It is based on good sense and every person efficient in analysis can individually create such a sequence.